29 CFR 1926.760: Fall protection

The official text is on the eCFR. This page maps how the section is organized, quotes the paragraphs our CHST practice questions are built on, and gives free questions you can try. Text below is quoted from the eCFR, current as of 2026-10-14; the section was last amended 2016-09-01.

How 29 CFR 1926.760 is organized

  • (a) General requirements3 paragraphs
  • (b) Connectors4 paragraphs
  • (c) Controlled Decking Zone (CDZ)8 paragraphs
  • (d) Criteria for fall protection equipment3 paragraphs
  • (e) Custody of fall protection3 paragraphs

Paragraphs our practice questions cite most

Counted across the 7 live PassCited questions built on this section. This reflects our question bank, not the real exam.

“(7) Final deck attachments and installation of shear connectors shall not be performed in the CDZ.”
“(2) Perimeter safety cables. On multi-story structures, perimeter safety cables shall be installed at the final interior and exterior perimeters of the floors as soon as the metal decking has been installed.”
“(3) Be provided, at heights over 15 and up to 30 feet above a lower level, with a personal fall arrest system, positioning device system or fall restraint system and wear the equipment necessary to be able to be tied off; or be provided with other means of protection from fall hazards in accordance with paragraph (a)(1) of this section.”
“(2) Access to a CDZ shall be limited to only those employees engaged in leading edge work.”
“(2) Fall arrest system components shall be used in fall restraint systems and shall conform to the criteria in § 1926.502 (see appendix G). Either body belts or body harnesses shall be used in fall restraint systems.”

Free practice questions on 29 CFR 1926.760

Question 1

A steel erection crew has established a marked controlled decking zone (CDZ) on a floor 24 feet above the level below, and metal decking is being placed at the leading edge. To save time, the foreman wants a CDZ-trained employee to weld shear connectors and make final deck attachments on panels already placed inside the CDZ while the leading-edge crew keeps working. Unsecured decking in the zone is well under the allowed area, and each panel already has two safety deck attachments. What does the standard require?

Show answer and source

Answer: D. The work must be done outside the CDZ, because final deck attachments and shear connector installation are not permitted inside it.

The standard says final deck attachments and installation of shear connectors shall not be performed in the CDZ, so this work has to move outside the zone. Training, two safety attachments per panel, and staying under the unsecured-decking limit are separate CDZ conditions and do not make this work permissible inside it.

Answer D rests on

29 CFR 1926.760(c)(7)(opens ecfr.gov in a new tab)
“(7) Final deck attachments and installation of shear connectors shall not be performed in the CDZ.”

Report a problem

We re-check reported questions against the regulation and fix or remove them.

Question 2

A steel erection crew is installing metal decking at a leading edge under a controlled decking zone (CDZ). The foreman proposes this plan for the shift: (1) lay panels and make safety deck attachments working from the leading edge back toward the control line; (2) keep unsecured decking within the CDZ under the allowed limit; and (3) have a second crew of trained leading edge workers install the shear connectors and make the final deck attachments inside the CDZ while the first crew continues forward. Which part of the plan violates the standard, and what must the foreman change?

Show answer and source

Answer: D. Step 3 violates the standard because final deck attachments and shear connector installation must not be performed in the CDZ, so that work must be moved outside the CDZ

The standard prohibits final deck attachments and shear connector installation in the CDZ, so that work must occur outside it even when the crew is trained. Safety deck attachments from the leading edge back to the control line are allowed, and the standard permits unsecured decking up to a limit rather than banning it.

Answer D rests on

29 CFR 1926.760(c)(7)(opens ecfr.gov in a new tab)
“(7) Final deck attachments and installation of shear connectors shall not be performed in the CDZ.”

Report a problem

We re-check reported questions against the regulation and fix or remove them.

Where it shows up in exam prep

Find out which regulations you'd miss

The free 25-question diagnostic scores you by blueprint domain and shows the exact rule behind every answer.

Other Part 1926 sections

This is a study aid, not legal advice or an official interpretation. Always check the current eCFR text. Original practice questions, not real exam items. PassCited is not affiliated with or endorsed by BCSP.