System safety process
ASP video lesson, 6:38. ASP Domain 2: Safety Programs and Concepts
MIL-STD-882E system safety for the ASP exam: the eight-element process, severity and probability risk assessment, the design order of precedence, risk acceptance and the user representative.
Included with every ASP pass, with captions, chapters and the full transcript. Every rule and number is cited on screen to its primary source.
What this lesson covers
In this lesson, you'll learn to: name the eight elements of the system safety process, rank the design order of precedence from most to least effective, explain how severity, probability and risk assessment codes are used, and state who accepts risk, and who must concur. This DoD standard practice opens with definitions. Start with two.
- Intro
- Learning objectives
- Core definitions
- The process
- Hazards and the HTS
- Assess risk
- Design order of precedence
- Risk acceptance
- After fielding
- On the job
- Common exam traps
- Recap quiz
The video, captions and full transcript are included with every ASP pass. See passes
More ASP lessons
Compressed gas cylindersASP lesson, 6:17The testable rules for compressed gas cylinders: handling, storage distances, fuel gas use, leaks, hose and manifolds, under 29 CFR 1910.101 and 1926.350, for the ASP exam.
Excavation and trenchingASP lesson, 6:52ASP exam review of 29 CFR 1926 Subpart P: the 5-foot and 4-foot thresholds, utility locates, daily inspections, soil types, maximum allowable slopes, and who does what.
Fall protection in constructionASP lesson, 6:49Construction fall protection under 1926.501 and 1926.502: the 6-foot trigger, system criteria, guardrail, net, arrest and warning line numbers, and who must prepare and supervise.
See where you stand on the ASP
25 questions, free, no card. You get a readiness score for each ASP domain.
ASP®, CSP® and CHST® are registered marks of BCSP. PassCited is not affiliated with or endorsed by BCSP.