Skip to content

Lockout

Putting a lock on an energy isolating device so the equipment can't run until that lock comes off.

Definition, in the source's words

29 CFR 1910.147(b)(opens ecfr.gov in a new tab)
“Lockout. The placement of a lockout device on an energy isolating device, in accordance with an established procedure, ensuring that the energy isolating device and the equipment being controlled cannot be operated until the lockout device is removed.”

What it means

A lockout physically prevents operation. Under 1910.147(c)(2), if an energy isolating device can be locked out, the program uses lockout unless the employer can show that tagout gives full employee protection.

The sequence in 1910.147(d) is: prepare, shut down, isolate, apply the lock or tag, relieve stored energy, and verify isolation before starting work.

Example

To clear a jam in a conveyor, a mechanic stops it with the normal controls, opens the disconnect, puts a personal lock on the disconnect, bleeds the air from the take-up cylinder, then presses start to confirm nothing moves before reaching in.

Where it appears on the exam

Questions

When is tagout alone allowed instead of lockout?
When the energy isolating device can't be locked out, or when the employer can show that its tagout program gives employees full protection, equivalent to lockout (1910.147(c)(2) and (c)(3)).

Related

Checked 2026-10-16. Spot a problem? Email hello@passcited.com.

See where you stand on the ASP

The free 25-question diagnostic scores you on every blueprint domain and shows the source behind each answer.