29 CFR 1926.651: Specific excavation requirements
The official text is on the eCFR. This page maps how the section is organized, quotes the paragraphs our ASP, CHST, CSP practice questions are built on, and gives free questions you can try. Text below is quoted from the eCFR, current as of 2026-10-14; the section was last amended 2016-09-01.
How 29 CFR 1926.651 is organized
- (a) Surface encumbrances1 paragraph
- (b) Underground installations4 paragraphs
- (c) Access and egress—(1) Structural ramps6 paragraphs
- (d) Exposure to vehicular traffic1 paragraph
- (e) Exposure to falling loads1 paragraph
- (f) Warning system for mobile equipment1 paragraph
- (g) Hazardous atmospheres—(1) Testing and controls7 paragraphs
- (h) Protection from hazards associated with water accumulation3 paragraphs
- (i) Stability of adjacent structures7 paragraphs
- (j) Protection of employees from loose rock or soil2 paragraphs
- (k) Inspections2 paragraphs
- (l)1 paragraph
Paragraphs our practice questions cite most
Counted across the 19 live PassCited questions built on this section. This reflects our question bank, not the real exam.
“(iv) When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe.”
“(2) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation.”
“(2) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.”
“(e) Exposure to falling loads. No employee shall be permitted underneath loads handled by lifting or digging equipment. Employees shall be required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. Operators may remain in the cabs of vehicles being loaded or unloaded when the vehicles are equipped, in accordance with § 1926.601(b)(6), to provide adequate protection for the operator during loading and unloading operations.”
“(2) Utility companies or owners shall be contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of the utility underground installations prior to the start of actual excavation. When utility companies or owners cannot respond to a request to locate underground utility installations within 24 hours (unless a longer period is required by state or local law), or cannot establish the exact location of these installations, the employer may proceed, provided the employer does so with caution, and provided detection equipment …”
Free practice questions on 29 CFR 1926.651
Question 1
A crew is excavating a 6-foot-deep utility trench on a site that was previously a landfill. The competent person asks when the atmosphere in the trench must be tested. According to the standard, when is testing required?
Show answer and source
Answer: A. Before employees enter the excavation, because a hazardous atmosphere could reasonably be expected and the depth is greater than 4 feet
The standard requires testing before employees enter excavations deeper than 4 feet where a hazardous atmosphere could reasonably be expected, such as in landfill areas. Waiting for symptoms or using a 12-foot threshold would not protect workers, and neither appears in the standard.
Answer A rests on
29 CFR 1926.651(g)(1)(i)(opens ecfr.gov in a new tab)“Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, the atmospheres in the excavation shall be tested before employees enter excavations greater than 4 feet (1.22 m) in depth.”
Question 2
A crew is excavating a utility trench for a new water service. The excavation is expected to cross the area where a buried gas line may run. The competent person called the gas utility, but the utility says it cannot send a locator for 3 days, and no state or local law requires a longer response period. What may the employer do?
Show answer and source
Answer: B. Proceed with caution, provided detection equipment or other acceptable means are used to locate the utility installations
When the utility cannot respond within 24 hours (absent a longer period required by state or local law), the employer may proceed, but only with caution and with detection equipment or other acceptable means to locate the installations. Proceeding with normal methods and no detection ignores that condition, and the standard does not require a complete work stoppage.
Answer B rests on
29 CFR 1926.651(b)(2)(opens ecfr.gov in a new tab)“When utility companies or owners cannot respond to a request to locate underground utility installations within 24 hours (unless a longer period is required by state or local law), or cannot establish the exact location of these installations, the employer may proceed, provided the employer does so with caution, and provided detection equipment or other acceptable means to locate utility installations are used.”
Question 3
A crew is installing a storm sewer in a trench. Overnight rain left water accumulating, and the foreman has a sump pump running to hold the water level down so the crew can re-enter. The foreman says the pump will "take care of itself" and assigns no one to watch it. Midmorning, the pump's discharge hose kinks and the pump stops without anyone noticing while four workers are in the trench. Which statement best identifies what the standard required that would have addressed this situation?
Show answer and source
Answer: D. A competent person had to monitor the water removal equipment and its operation to ensure it was working properly, since the pump was the control keeping water from accumulating.
Because water removal equipment was being used to control accumulation, the standard requires a competent person to monitor both the equipment and its operation to ensure proper operation. Merely installing the pump and walking away does not meet this duty, and the standard lists water removal as an acceptable precaution rather than limiting precautions to a harness and lifeline.
Answer D rests on
29 CFR 1926.651(h)(2)(opens ecfr.gov in a new tab)“If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation.”
Question 4
After a thunderstorm overnight, a crew returns to a 7-foot-deep utility trench. Before anyone enters, the competent person walks the trench and finds fresh cracking along the top of one wall and water seeping from the face. The foreman says the trench was inspected yesterday morning and the crew is behind schedule, so two laborers should begin setting pipe while the competent person goes to inspect another site. What does the standard require in this situation?
Show answer and source
Answer: D. Employees must be kept out of the hazardous area until the necessary precautions have been taken to ensure their safety
The competent person found evidence of a possible cave-in after a rainstorm, so exposed employees must be removed from the hazardous area until precautions have been taken. Yesterday's inspection does not satisfy the requirement, because inspections are also required after every rainstorm or other hazard-increasing occurrence.
Answer D rests on
29 CFR 1926.651(k)(2)(opens ecfr.gov in a new tab)“Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.”
Question 5
After a heavy overnight rainstorm, a competent person inspects a trench before the crew starts work. She finds water pooled along one wall and fresh soil sloughing from it. Two workers already in the trench are laying pipe, and the crew lead says the morning inspection is done, so work should continue and be rechecked at the end of the shift. What does the standard require?
Show answer and source
Answer: D. Remove the exposed employees from the trench until the necessary precautions have been taken to ensure their safety.
When the competent person finds evidence of a possible cave-in or other hazardous condition, the standard requires exposed employees to be removed from the hazardous area until precautions are in place. Waiting for the end of the shift is wrong because the daily inspection does not excuse leaving workers exposed. Spoil setback addresses material falling into the excavation, not an unstable wall.
Answer D rests on
29 CFR 1926.651(k)(2)(opens ecfr.gov in a new tab)“Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.”